Hall Closet / Condo Reno

back wall 41″ taped layout v17 holds plan v18 shelving 3 gates open
Render of the closet from the doorway: air handler upper left, mesh baskets under it, oak shelf tower on the back wall, shoe shelves and a hanging bay on the right wall

A closet that shares its space with an air handler

A reach-in hall closet, 41 inches wide, with a wall-mount heat pump air handler filling the upper left and the condensate drain running through the back wall. The design started as a LiDAR scan and a 48-inch model. A tape measure said 41. This page is the version that survived that.

41″back wall, taped
44″deep, 95″ ceiling
19½″A/C projection
10–24″no-drill bay

The design

  • Back wall: a 15¾″ basket column under the A/C, an open gap for the drain, and a 15¾″ five-shelf tower.
  • Right wall: one 60 cm bay: slanted shoe shelves low, a hanging rod under a shelf, a top shelf.
  • Left wall: the air handler, a vacuum dock and a longboard. Nothing built in.

Why the back wall only takes 40 cm sections

The air handler fills the left 19½″ above about 45″, and the drain trap sticks out at 21½″. Every position for a 60 cm (23⅝″) rail lands under the unit or on the pipe. So the 60 cm parts already bought go on the right wall, and the back wall gets narrow 40 cm (15¾″) sections.

Still open

  • gateWhere the electrical disconnect sits on the right wall. If it's in the front 24″, the right bay moves back or loses the rod.
  • gateThe air handler's underside height, against the corner column's ~44″ rail.
  • gateWhether the corner column stays at all. The unit pulls its return air through its underside.

The model

The v17 Blender model at the real 41″ width, front wall removed. Drag to orbit, scroll or pinch to zoom.

From the doorway
From the doorway.
Looking at the right-wall bay
The right-wall bay: shoes low, hanging in the middle, a shelf on top.
Straight at the back wall
Back wall: baskets under the A/C, the drain gap, the tower.

Walls

Elevations drawn from the field measurements. Heights are above the finished floor, in inches. Dashed items still need a tape check.

air handler no-drill (drain in the wall) keep clear shelf upright / rail verify on site

Rules the layout follows

  • Screws on the back wall go into studs or the corner framing only (studs at about 10, 24 and 36″). The drain runs up the bay between 10 and 24″ from the left, floor to 50″.
  • No toggles on the back wall. Toggle anchors only on the right wall.
  • The drain cleanout stays reachable behind the baskets. They lift out.
  • Storage under the air handler is allowed; behind it is not. That gap is the trap and service access.
  • The tall rails hang with their top at about 84″. The 78¾″ uprights then stop about 5″ off the floor, clear of the 3.9″ baseboard. Dry-fit one before drilling.
  • The electrical disconnect stays reachable, and clothes never hang over it.

Parts

IKEA BOAXEL in anthracite with oak-effect shelves. Most of it was bought for the 48″ plan before the wall was measured, so the job now is to use what's here and buy only the narrow pieces.

ownOn hand

QtyPartGoes to
4Wall upright 200 cmtower ×2, right bay ×2
1Wall upright 100 cmcorner column
1Suspension rail 62 cmright bay
3Shelf, oak effect 60×40cut down to 40 cm for the back wall
4Shelf, metal 60×40right bay ×2, 2 spare
2Shoe shelf 60×40right bay
1Clothes rail 60 cmright bay
2Mesh basket 60×40×15spare
22Bracket 40 cmeverywhere

buyStill needed

QtyPartFor
3Shelf 40×40tower + corner (the other 3 come from cutting the oak)
3Mesh basket 40 cmcorner column
1Wall upright 100 cmcorner column
2Suspension rail, 40 cm sectiontower + corner
~4Bracket 40 cmthe planner confirms
1Oak-effect iron-on edge bandingthe three cut ends

Cut it or buy it

  • Cut: the oak shelves, 60 → 40 cm with a 40-tooth blade, then edge-band the raw end.
  • Cut if needed: the upright bottoms with an oscillating tool, then file and paint the bare steel.
  • Don't cut: the metal shelves (the cut end loses its folded lip), the wire baskets, or the rails.

Fasteners and finishing

#10 × 2½″ wood screws into studs on the back wall; toggle anchors on the right wall; a stud finder, a level, and a ⅛″ pilot bit.

Build plan

The order matters: the air handler first (it's what stained the walls), then walls, then the door, then paint, then shelving. Ticks save in this browser.

0 of 0 done

The air handler

A wall-mount Trane heat pump air handler with electric heat strips, about eleven years old. Opening it up explained the stains on the walls.

foundWhat the panel came off to

  • Rust and water staining across the insulation around the drain pan: it has overflowed more than once.
  • A float switch at the pan outlet, which shuts cooling off when the drain backs up.
  • An open gap with bare fiberglass where the supply duct meets the ceiling, and dark spotting on the ceiling beside it.

The fix list

  • Power off at the breaker and the wall disconnect before any panel comes off.
  • Vacuum the drain from the vent tee, then flush it with vinegar.
  • Clean the pan. If it's rusted through, it's a technician's job.
  • Replace the cabinet liner with ½″ closed-cell foam rated for HVAC use. Trane's spec for this cabinet family is ½″ faced insulation on stick pins.
  • Seal the duct-to-ceiling gap with UL 181 foil tape.

printedA wet-vac adapter for the drain

A 3D-printed coupler from the shop vac's 1⅞″ wand to the ¾″ PVC vent tee. The pipe end is exact, because ¾″ Sch 40 PVC is a standard 1.050″ OD. The vac end is a long self-seating taper (49 → 46 mm), because the vac maker publishes only the nominal size.

PlateWhatSlice
01Fit-test rings22 g · 45 min
02Adapter, vent-tee socket64 g · 1 h 36
03Adapter, cone nozzle55 g · 1 h 50

PETG HF · 6 walls · 100% infill · 2-loop skirt · no brim · sliced through Bambu Studio's CLI

Paint

A light warm neutral on the side walls, a bold accent on the back wall, and the same accent in semi-gloss on the door and trim. The accent is still a choice between one green and one navy. Swatches are screen approximations.

PatienceSW 7555 · side walls

JasperSW 6216 · accent option

NavalSW 6244 · accent option

Salty DogSW 9177 · accent option

Prep, in order

  1. Chair rail off, scar and holes spackled, patches sanded smooth.
  2. Krud Kutter wash on every wall, plus the ceiling spots after a mold test.
  3. B-I-N shellac primer on the condensate streaks and stains.
  4. 1-2-3 primer everywhere, tinted gray under a navy.
  5. Patience on the side walls first, then the accent on the back wall.
  6. Door off, bottom trimmed, scuff-sanded (sponges for the louvers), semi-gloss both sides.
  7. Three to five days of cure before any rail goes up.

How I made this

The closet started as an iPhone LiDAR scan, became a Blender model with a clearance audit gating every render, and went through sixteen versions at 48″ wide. Then a tape measure said 41, and the plan was rebuilt around the real wall in v17.

This round was a working session with Claude in Claude Code: reading the air handler's nameplate and Trane's installer guides, reconciling an IKEA order against the model, sizing a drain-vac adapter and writing its print plates with the bench's own plate writer, and turning it all into one ordered build plan.

The renders here come straight from the v17 model; the elevations are drawn in the page from the field measurements.

Pipeline

  • iPhone LiDAR scan → Blender (bpy), clearance audit per version
  • Field check: tape, photos, AR measure → v17 at 41″
  • OpenSCAD → Bambu Studio plates via the bench's plate writer, verified by CLI slice
  • Plan and checklist in Notion; this page for the overview